Search This Blog

Friday, February 11, 2011

Overview

Last night and late this afternoon the transmission brake assembly was removed and the parts cleaned and those needing it are spending the night in Evapo-Rust. Looks as if the fuel tank will have to be removed to take out the remaining bolts which are holding the shaft for the hand brake relay lever.

This weekend the temperature forecasts are good for painting the remaining front axle and steering parts. In the view below the parts awaiting painting are spread out everywhere (most, but not all, parts that are already painted are stored away in the basement). The tub and roof are where they are just because I have nowhere else to put them for now, although once all the front axle parts are assembled and on the new chassis, the tub and roof will be moved over to sit on the new chassis (just visible under the gray fabric) temporarily while I work on the rear axle.